20 May 1995 L. Acton SXT TABLE PLAN FOR WEEK 21 (21-MAY-95 to 27-MAY-95) As the SXT Chief observer will be attending IAU153 all week except for 24-May there will be limited SXT table uploads. The upload for 23-May to replace the DKCAL table will have to be sent to KSC by the KSC tohbans. It will be prepared and waiting in the UPLOAD table. The observing objectives of this plan are: - Standard observing - Dark Calibration on MONDAT. - Continuation of terminator-offpointing campaign as possible. It is possible that additional table uploads will be requested for the purpose of the changing the terminator image. KSC Time (start) in JST Pass Table ID Comments _____________(= UT + 9 hrs)______#_______________________________ Monday 22-MAY-95 16:42 4 950522 P4 ARS1 DKCAL Tuesday 23-MAY-95 13:36 2 950523 P2 ARS1 STD+LONG Wednesday ****** No Table upload planned at this time. ******** Thursday ****** No Table upload planned at this time. ******** Friday ****** No Table upload planned at this time. ******** Saturday ****** No Table upload planned at this time. ******** Sunday ************* KSC HOLIDAY *************************** Terminator-Offpointing: The terminator-offpointing program will continue this week. The SSOC tohbans will be required to manually insert the off-point OGs for the terminators in the OP tables. The SSOC tohbans please fax the preliminary OP list to D-tou when it contains a terminator so that the Chief Observer can designate the offpoints. It is not necessary to fax the final OP list.