LASCO/EIT Operations Status Daily Reports -- May 1996 31-May-1996 (C1-C2-C3-EIT synoptic) 30-May-1996 (C1-C2-C3-EIT synoptic) 29-May-1996 (C1-C2-C3-EIT synoptic; re-center M1 at 19:05 UT, EIT XBP) 19:05 m1_center.sce (with new values) 28-May-1996 (C1-C2-C3-EIT synoptic; LEB power cycled 2x) OBE hung waiting for ICE response ~15:45; during re-boot the POCC lost commandability during fp startup, so entire process was repeated Confirmed EIT Sector Wheel Hang (note TM temperatures) LEB power cycled at 16:08, 17:12 UT 27-May-1996 (C1-C2-C3-EIT synoptic) l_set_lobt executed ~19:09 UT to fix ~4 min. drift 26-May-1996 (C1-C2-C3-EIT synoptic) EIT CCD heater inadvertently turned on/off during xray bp study by incorrect camera table 25-May-1996 (C1-C2-C3 synoptic; EIT CCD bakeout ends at 16:38 UT) 24-May-1996 (C1-C2-C3 synoptic; EIT CCD bakeout) 20:21 EIT zones SP=110 Alg ON. Deriv FALSE P=5, I=2, D=0 23-May-1996 (Open LASCO doors; EIT cals & CCD bakeout; COB/M1 centering) All LASCO doors opened ~15:47-16:07 UT EIT Continuous RO images EIT CCD bakeout begins ~19:21 UT COB leg movements begin ~21:26 UT 22-May-1996 (REBOOT LEB; close LASCO doors) (Debug Points 1,3,4 through multiple flushes) Cycle power to LEB ~15:56 UT Closed all LASCO doors ~17:05-17:14 UT prior to Orbit trim and Momentum Management 21-May-1996 (90 degree roll for JOP002; C1 NaI cal) C1 calibration sequence new_naI_cal_1 during 90 degree roll at ~02:30 and ~11:30 UT, and at ~20:00 (0 degrees) C2 and C3 color and Orange pw sequences (all 2x2 binned) taken before, during, and after the roll EIT participation in JOP 002 (North coronal hole study) 20-May-1996 (C1-C2-C3-EIT synoptic; prepare for 90 degree roll) 02:12 UT C3 image with "swarm of space debris" EIT testing before 90 degree roll C1 calibration sequence new_naI_cal_1 began at ~20:00 UT 19-May-1996 (C1-C2-C3-EIT synoptic) 18-May-1996 (EIT AR study; LASCO doors opened; C1-C2-C3-EIT synoptic) EIT AR 7962 SW limb study LASCO doors re-opened 15:27-15:35 UT 17-May-1996 (C1-C2-C3-EIT synoptic; LASCO doors closed) 20:00-20:20 UT all LASCO doors closed for momentum mngmnt. burns EIT study of AR 7962 at SW limb 16-May-1996 (C1-C2-C3-EIT synoptic) 15-May-1996 (C1-C2-C3-EIT synoptic) 14-May-1996 (C1-C2-C3-EIT synoptic; EIT JOP 22; testing for synoptic) EIT JOP022 at 20:03, 20:29, 23:44 UT 13-May-1996 (C1-C2-C3-EIT synoptic; C1 testing for synoptic) 12-May-1996 (C1-C2-C3-EIT synoptic) 11-May-1996 (C1-C2-C3-EIT synoptic; C1 testing for synoptic) 10-May-1996 (C1-C2-C3-EIT synoptic; EIT testing for synoptic) Testing of C1 with check & correct 19:01-19:43 UT 09-May-1996 (C1-C2-C3-EIT synoptic; EIT testing for synoptic) 08-May-1996 (C1-C2-C3-EIT synoptic; EIT testing for synoptic) 07-May-1996 (C1-C2-C3-EIT synoptic) 06-May-1996 (C3 Comet Hyakutake obs end; EIT 2x2 test; HR tlm; LEB REBOOT) Test of multiple EIT 2x2 CCD summing failed 30 minutes of HR (submode 2) tlm with EIT 195 images at 20:30 UT LEB REBOOTed at 22:30 UT to clear 04 May SeqPW anomaly 05-May-1996 (C3 Comet Hyakutake obs; some C1-C2-EIT) 04-May-1996 (C3 Comet Hyakutake obs; some C1-C2-EIT) Investigated SeqPW anomaly Commanded movements of C3 Polarizer Wheel 17:54-18:15 UT 03-May-1996 (C3 Comet Hyakutake obs; some C1-C2-EIT) 02-May-1996 (C3 Comet Hyakutake obs; some C1-C2-EIT) 01-May-1996 (C3 Comet Hyakutake obs; some C1-C2-EIT)