LASCO/EIT Operations Status Daily Reports -- September 2005 ----------------------------- C2-C3-EIT synoptic = EIT 195A 12 minute; C2 20 minute; C3 30 min cadence. C2-C3 Daily Polarizer Sequences in Orange Filter. C2-C3 orange/blue filter fielding Sun,Tues,Thurs,Sat. Weekly, Dark Cal Images (Sat) C1,C2,C3 at 0 and 60 Sec, EIT at 0 and 3 sec. (Sat) C2,C3 Blue Polarizer Sequence, (Sun) C2,C3 Deep Red Polarizer Sequence (Sat) C2,C3 Color Sequence Images, 2x2 binned (03:00 UT) ------------------------------------------------------------------------------- 30-Sep-2005 (C2-C3-EIT synoptics) TM Submode 6; [S/C-0] 20:04 UT uplinked l_set_lobt (set Lasco time) 29-Sep-2005 (C2-C3-EIT synoptics) TM Submode 6; [S/C-0] 28-Sep-2005 (C2-C3-EIT synoptics) Kreutz Comet; Filament Study; TM Submode 6; [S/C-0] 07:00-19:00 Filament studies w/THEMIS/CDS 12 min cadence 304A FFFRes Kreutz comet in C3 C2 Color Sequence Ip=17, FFFres 00:40 Came into C2 field in bottom right corner, touched at 00:20 00:46 UT uplinked l_set_lobt (set Lasco time) 27-Sep-2005 (C2-C3-EIT synoptics) TM Submode 6; [S/C-0] 26-Sep-2005 (C2-C3-EIT synoptics) TM Submode 6; [S/C-0] 25-Sep-2005 (C2-C3-EIT synoptics) Colors; TM Submode 6; [S/C-0] Weekly C2,C3 deep red filter polarizer sequence taken. 24-Sep-2005 (C2-C3-EIT synoptics) Filament Study; Darks,cals,colors; TM Submode 6; [S/C-0] 07:00-19:00 Filament studies w/THEMIS/CDS 12 min cadence 304A FFFRes Weekly C2,C3,EIT dark images taken. Weekly EIT calibration lamps x2 taken. Weekly C2,C3 color sequence taken. Weekly C2,C3 blue filter polarizer sequence taken 23-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 6; [S/C-180] 10:00-13:30 UT EIT CCD bakeout ends from plan. Cool down dark program 13:24 UT Transition TM Submode 5 -> 6 21:15 UT uplinked l_set_lobt (set Lasco time) 21:21-01:06 UT EIT post bake cals taken. 22-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-0] 21-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-0] 20-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-0] 19-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-0] 11:29 UT uplinked l_set_lobt (set Lasco time) 18-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-0] 17-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-0] 16-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-0] 15-Sep-2005 EIT CCD Bakeout; CDS Open; TM Submode 5; [S/C-0] 13:06 UT uplinked l_set_lobt (set Lasco time) 13:09 UT C2 & C3 Close for CDS to reopen 14:33 UT CDS Open 15:47 UT C2 & c3 Open 15:58 UT Synoptics resume 14-Sep-2005 EIT CCD Bakeout; CDS Closed; TM Submode 5; [S/C-0] 13-Sep-2005 EIT CCD Bakeout; CDS Closed; TM Submode 5; [S/C-0] 12:27 UT uplinked l_set_lobt (set Lasco time) 12-Sep-2005 EIT CCD Bakeout; CDS Closed; TM Submode 5; [S/C-0] 11-Sep-2005 EIT CCD Bakeout; CDS Closed; TM Submode 5; [S/C-0] 10-Sep-2005 EIT CCD Bakeout; CDS Closed; TM Submode 5; [S/C-0] 09-Sep-2005 EIT CCD Bakeout; C2 & C3 Open; CDS Closed; TM Submode 5; [S/C-0] 12:10 UT Lasco Doors Open CDS remains closed for testing 12:29 UT Synoptics resume 18:00-00:52 UT Cal Lap Stocks 08-Sep-2005 EIT CCD Bakeout; LASCO Doors Closed; TM Submode 5; [S/C-0] S/C Roll Maneuver Today 15:38-18:00 Door Closed Darks (long set) 07-Sep-2005 EIT CCD Bakeout; LASCO Doors Closed; TM Submode 5; [S/C-180] 11:04 UT uplinked l_set_lobt (set Lasco time) 11:13 UT Lasco Doors CLOSED in prep of S/C Keyhole #10 S/C Roll -180 -> 0 degrees 06-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-180] 05-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-180] 04-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-180] 03-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-180] 02-Sep-2005 (C2-C3-EIT synoptics) EIT CCD Bakeout; TM Submode 5; [S/C-180] Orbit Keyhole #10 begins 19:36-21:10 UT EIT PRE-Bake Mini Calibration. 21:33 UT uplinked l_set_lobt (set Lasco time) 21:37 UT EIT begins CCD Bakeout. Bake continues till September 23, 2005 01-Sep-2005 (C2-C3-EIT synoptics) TM Submode 6; [S/C-180]