LASCO/EIT Operations Status Daily Reports -- October 1998 ----------------------------- C2-C3-EIT synoptic = EIT 12 min cadence; C2 30 min cadence; C3 1 hour cadence ----------------------------------------------------------------------------- 31-Oct-1998 (C2-C3-EIT synoptic); SPARTAN-210 Support; L_SET_LOBT; SM6 00:00 UT SPARTAN support; high cadence program consisting of; C2 Pb 2x2 LEB binned rice compress; 1 per hour C3 Pb 2x2 LEB binned rice compress; 1 every 4 hours. This will continue through Wednesday. 22:31 UT executed l_set_lobt 30-Oct-1998 (C2-C3-EIT synoptic); SPARTAN-201 Support; SM6 C1 reference images taken before COB cool-down. 22:52 UT LASCO heater zones reset to nominal. 29-Oct-1998 (C2-C3-EIT synoptic); SPARTAN-201 Support; C1 FP Tests; SM6 20:38-02:30 UT C1 FP testing. The LASCO heater zones were elevated +5 degC in all 5 areas to move the components of the FP and flex the COB. The temperatures stayed elevated thru the night. 19:15 UT launch of SST-95 with the SPARTAN payload. To be deployed Sunday Nov 1st at 18:36 UT with a 40 hour observation. 28-Oct 1998 (C2-C3-EIT synoptic); SPARTAN-201 Support; SM6 27-Oct-1998 (C2-C3-EIT synoptic); SPARTAN-201 Support; SM6 26-Oct-1998 (C2-C3-EIT synoptic); SPARTAN-201 Support; SM6 Spartan support consisting of C2, C3 orange filter polarizer sequences; 2x2 LEB binned; C2- 4/day, C3- 2/day Spartan to be deployed from Shuttle Sunday Nov 1 at 18:36 UT for a 40 hour observation plan. We will support till Nov 10th. 25-Oct-1998 (C2-C3-EIT synoptic); SM6 24-Oct-1998 (C2-C3-EIT Synoptic); C2,C3 COlor Seq; SM6 Continued C2, C3 color sequence calibrations. 23-Oct-1998 (C2-C3-EIT synoptic); C2,C3 Color Seq; SM6 C2 and C3 polarizer sequences in all colors taken, 2x2 LEB binned 22-Oct-1998 Take_Sequence; C1 FP Commissioning; Set LOBT; Synoptic; SM6 18:57 UT l_set_lobt upliked 19:30-20:45 UT C1 FP testing. All 3 PZT's show activity. 20:54-21:15 UT C1 Underscan region 0 sec dark images, all ports 21:50 UT Venus seen in C2 field of view in North West. Synotic plan executed; EIT 12 min cad FFFr, C2 30 min cad, C3 1 hr cadence, EIT synoptic sets 6 hr cadence @1,7,13,19 UT. 21-Oct-1998 C1 Camera FP Commissioning; C2,C3 Doors Opened;Take_sequence; SM6 22:31 UT C2 and C3 doors opened. At the same time the FOT monitoring program for LEB activity was tested for the new program and found to be successfull. 23:05-00:28 UT C1 FP testing. Successfull PZT activity found. 00:32 UT Take_sequence sent /w eit, C2, and C3 20-Oct-1998 C1 Camera Check-Out; FP Commissioning; SM6 17:00-00:00 UT Continued FP testing and C1 camera mech. check-out 22:08 UT First C1 take normal image; FeXIV/Clear FFFr, door closed. Overnight, continued C2 and C3 door closed cals with EIT 195's 19-Oct-1998 EIT Full Calibration Set; SM6 17:00-19:00 UT C1 FP check-out 19:00-24:00 UT EIT full cal set; filter wheel sequences Over night, C2 & C3 Door Closed Calibrations with EIT FFFr images 18-Oct-1998 C2, C3 Door Closed Calibrations; SM6 20:00 UT C2, C3 door closed calib; color seq. cal lamps, darks EIT FFFr 195 images with synoptics at 7 min cadence where pos. 17-Oct-1998 C2, C3 Door Closed Calibrations; SM6 20:00 UT C2, C3 door closed calib; color seq. cal lamps, darks EIT FFFr 195 images with synoptics at 7 min cadence where pos. 16-Oct-1998 Momentum Management; Roll Correction; Submode 6 21:35-00:10 UT Correction of 58 Deg S/C roll; Station Keeping and momentum management. EIT FFFr at 7 min cadence with synoptics (during contact times). 15-Oct-1998 C2 Camera Check-Out; Submode 5 to 6 18:26 UT Transition from Submode 5 to 6 20:10 UT C2 doors opened; Check-Out successful. 20:15 UT C2 first image. 23:34 UT C2 and C3 Doors closed to prepare for momentum management. 14-Oct-1998 C3 Camera Check-Out 19:12 UT C3 doors opened; Check-out successful 19:17 UT C3 first image. 20:34 UT First all-night observing program since reacquisition. 13-Oct-1998 LASCO and EIT Power-On; EIT Camera Check-Out 17:33 UT command sent by FOT. A manuall boot of all systems was done and successful. 20:39 UT Transition from Submode 1 to Submode 5 20:57 UT EIT door was open and took it's first 195A image C1 FP checked and found to have problems C2 and C3 checked out successful 5-Oct-1998 INSTRUMENT RECOMMISSIONING BEGINS!!! 1-Oct-1998 Thru 12-Oct-1998 LASCO and EIT Instrument Warming Instruments warmed using spacecraft substitution heaters until power-on scheduled for Oct 13, 1998.