LASCO/EIT Operations Status Daily Reports -- October 1996 31-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch) Continued C1 FeXIV and FeX subfield SW limb AR watch YA revision to C1 field-of-view (193,212/832,851) 30-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch; Mercury in C2) Continued C1 FeXIV and FeX subfield SW limb AR watch Revision to C1 field-of-view (225,212/864,851) 29-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch) Continued C1 FeXIV and FeX subfield SW limb AR watch 28-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch) Continued C1 FeXIV and FeX subfield SW limb AR watch 27-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch) Continued C1 FeXIV and FeX subfield SW limb AR watch 26-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch) Continued C1 FeXIV and FeX subfield SW limb AR watch 25-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch) Continued C1 FeXIV and FeX subfield SW limb AR watch 24-Oct-96 (C1-C2-C3-EIT synoptic; C1 SW limb watch) Began C1 FeXIV and FeX subfield SW limb AR watch 23-Oct-96 (C1-C2-C3-EIT synoptic) FeXIV line scan and C2/C3 Seq. PW are LEB-binned in this and subsequent daily command sequences. 22-Oct-96 (C1-C2-C3-EIT synoptic; LEB REBOOT) Unsuccessful testing of LEB-summing + LEB-binning 19:24 LEB REBOOTed due to introduction of "bit-shift" error in all subsequent images 21-Oct-96 (C1-C2-C3-EIT synoptic; LEB REBOOT) Unsuccessful test of C2 LEB-binning + LEB-summing 19:30 OBE crashes when SCCB pointer is reset LEB power cycled at 19:33 UT 20-Oct-96 (C1-C2-C3-EIT synoptic) ~16:30 NRT interruptions cause ~1 hour data gap 19-Oct-96 (C1-C2-C3-EIT synoptic) 18-Oct-96 (C1-C2-C3-EIT synoptic) 17-Oct-96 (C1-C2-C3-EIT synoptic; C1 testing; zone heater testing) 18:00-19:00 FeXIV high cadence test (30 iterations SE AR) 19:00-20:00 FeXIV dynamic imaging test 20:30-21:00 C2 zone heater test 16-Oct-96 (C1-C2-C3-EIT synoptic; C1 high cadence; C3 comet) 17:30 C1 FeXIV reduced field test sequence C3 NW quadrant images of Comet Machholz: (1,20/512,531) 15-Oct-96 (C1-C2-C3-EIT synoptic; C1 overexposure test; C3 comet) ~17:00~20:00 C1 overexposure testing ~17:00~18:00 C3 Comet Machholz Blue/Red 4P sequences 14-Oct-96 (C1-C2-C3-EIT synoptic) 13-Oct-96 (C1-C2-C3-EIT synoptic; Comet Machholz) S. Stezelberger recovered non-Kreutz comet Machholz in C3 field ~1 hour data gap when sequence ended but no commanding was available (~19:00 UT) 12-Oct-96 (C1-C2-C3-EIT synoptic) Increased number of FP check-and-corrects to ~1/hour 11-Oct-96 (C1-C2-C3-EIT synoptic; C2 high cadence test) 19:03 test of 10 C2 partial field at 2 minute cadence 10-Oct-96 (C1-C2-C3-EIT synoptic) 09-Oct-96 (C1-C2-C3-EIT synoptic; C1 camera error) 19:07 C1 peripheral error after flush; recovered by Scott (C1 reset from OBE) 08-Oct-96 (C1-C2-C3-EIT synoptic) 07-Oct-96 (C1-C2-C3-EIT synoptic) 06-Oct-96 (C1-C2-C3-EIT synoptic) 05-Oct-96 (C1-C2-C3-EIT synoptic) 04-Oct-96 (C1-C2-C3-EIT synoptic; change default C1 field) 18:30 change default C1 832x672 field by 1 pixel: new coords: (1,148/1024,915) 18:38 tested C2 expanded equatorial field (1024x768) 19:00 EIT light-leak calibration exposures 03-Oct-96 (C1-C2-C3-EIT synoptic; C1/EIT AR sequence) 02-Oct-96 (C1-C2-C3-EIT synoptic; C1/EIT AR sequence) 01-Oct-96 (C1-C2-C3-EIT synoptic; C1/EIT AR sequence; C1 overexposure test) 14:00-16:30 active region study; high-cadence C1 with limited field 19:30 C1 FeXIV overexposure test with LEB-binning