KEYHOLE Operations: ------------------- 2008/05/07 - 2008/05/25: 26 m keyhole 2008/05/11 - 2008/05/21: 34 m keyhole - LASCO closed doors on Sunday 2008/05/18 @ 21:30 UT in prep for for S/C Maneuvers (SK, MM. and Roll) on 05/19. - LASCO resumed observations on Wednesday 2008/05/21 @ 00:30 UT. - EIT CCD Bakeout Plan: 2008/05/16 18:30 UT - 2008/05/22 05:00 UT. Observations will then resume on 05/22 @ ~ 16:00 UT. During Bakeout period: LASCO in improved synoptics ==> C2 @ 12 min cadence, C3 @ 30 min cadence. - EIT resumed CME watch on 05/22 @ 15:57 UT. - Between 05/16 - 05/22, LASCO will remain idle during the telemetry no-record outage periods.
01:12 UT S East Faint feature developing gradually. 23:30 UT N West Bright jet-like front, top of a very narrow and elongated loop-like front. It fades througout C2.
02:06 - 06:30 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 09:06 UT