KEYHOLE Operations: ------------------- 2008/05/07 - 2008/05/25: 26 m keyhole 2008/05/11 - 2008/05/21: 34 m keyhole - LASCO closed doors on Sunday 2008/05/18 @ 21:30 UT in prep for for S/C Maneuvers (SK, MM. and Roll) on 05/19. - LASCO resumed observations on Wednesday 2008/05/21 @ 00:30 UT. - EIT CCD Bakeout Plan: 2008/05/16 18:30 UT - 2008/05/22 05:00 UT. Observations will then resume on 05/22 @ ~ 16:00 UT. During Bakeout period: LASCO in improved synoptics ==> C2 @ 12 min cadence, C3 @ 30 min cadence. - Between 05/16 - 05/22, LASCO will remain idle during the telemetry no-record outage periods.
LASCO doors closed (because of S/C Maneuvers on 05/19).
First C2 image after S/C Maneuvers: 00:46 UT First C3 image after S/C Maneuvers: 00:50 UT 02:00 - 07:00 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 10:12 UT