KEYHOLE Operations: ------------------ Mon 02/04 - Sun 03/02: 26 m keyhole Mon 02/11 - Sun 02/24: 34 m keyhole - EIT CCD Bakeout scheduled for 02/22 ~ 21:00 UT thru 02/28 ~ 22:00 UT. - S/C Maneuvers (SK, MM, and Roll) on 02/22. EIT observed the Roll. - UPDATED: LASCO safed for S/C Maneuvers on 02/19 ~ 13:30 UT and recovered on 02/23 ~ 20:00 UT. After recovering, LASCO will operate in improved cadence (SM5): C2 --> 12 min cadence, C3 --> 30 min cadence; in effect until 02/29. - During telemetry outage periods for this Keyhole LASCO and EIT will not be recorded (and instruments will remain idle).
19:48 UT W Limb Diffuse loop front. Early development missed in following data gap. After the data gap the event seems to have disintegrated. 20:00 - 22:06 UT lASCO Data Gap (C2 time).
01:50 UT S East Diffuse jet-like front. 05:06 UT W Limb Small structure developing gradually starts to be discerned. Last C2 image available by the time of writing: 11:26 UT