KEYHOLE Operations: ------------------ Mon 02/04 - Sun 03/02: 26 m keyhole Mon 02/11 - Sun 02/24: 34 m keyhole - EIT CCD Bakeout scheduled for 02/22 ~ 21:00 UT thru 02/28 ~ 22:00 UT. - S/C Maneuvers (SK and MM) scheduled for 02/19.s - LASCO will safe for S/C Maneuvers on 02/19 ~ 13:30 UT and recover on 02/21 ~ 22:30 UT. - S/C Roll scheduled for 02/22 15:50 - 21:50 UT. LASCO will close doors for the Roll due too offpointing protection being disabled during the maneuver (estimated time of closed doors: 02/22 16:00 - 19:30 UT). EIT will observe the Roll. - During telemetry outage periods for this Keyhole LASCO and EIT will not be recorded (and instruments will remain idle).
00:06 - 01:30 UT LASCO Data Gap (C2 time). 01:30 UT E Limb Slow development of a system of faint loop fronts. By 04:54 UT, the top of an inner core starts to be discernible. After the following data gap. a twisted structure can be seen developing. WIDTH in C3 by 12:42 UT: ~40 deg. 06:06 - 09:30 UT LASCO Data Gap (C2 time). 13:06 - 21:30 UT LASCO Data Gap (C2 time).
16:06 UT EN East Slow development of a faint front towards E (gradual event). Twisted trail. WIDTH in C3 at 02:18 UT: ~25 deg. 23:54 UT EN East Faint and very diffuse front in the trail of previous event.
12:54 UT S East Diffuse fan-like front. 12:54 UT S West Jet-like front followed by a faint and narrow fan-like front. 13:31 UT N Pole Diffuse and narrow spray-like front. 16:06 - 19:30 UT LASCO Data Gap (C2 time).
14:30 - 24:00 UT LASCO Data Gap (C2 time).
00:00 - 01:31 UT LASCO Data Gap (C2 time). 01:31 UT S West Narrow and very elongated loop-like front already under development. 06:54 - 12:06 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 12:30 UT