KEYHOLE Operations: ------------------ Mon 02/04 - Sun 03/02: 26 m keyhole Mon 02/11 - Sun 02/24: 34 m keyhole - EIT CCD Bakeout scheduled for 02/22 ~ 21:00 UT thru 02/28 ~ 22:00 UT. - S/C Maneuvers (SK and MM) scheduled for 02/19. - LASCO will safe for S/C Maneuvers on 02/18 ~ 11:00 UT and recover on 02/21 ~ 01:00 UT (still TBD). - S/C Roll scheduled for 02/22 15:50 - 21:50 UT. LASCO will close doors for the Roll due too offpointing protection being disabled during the maneuver (estimated time of closed doors: 02/22 16:00 - 19:30 UT). EIT will observe the Roll. - During telemetry outage periods for this Keyhole LASCO and EIT will not be recorded (and instruments will remain idle).
03:06 - 06:30 UT LASCO Data Gap (C2 time). 08:06 - 18:54 UT LASCO Data Gap (C2 time). 21:30 - 24:00 UT LASCO Data Gap (C2 time).
00:06 - 01:30 UT LASCO Data Gap (C2 time). 01:30 UT E Limb Slow development of a system of faint loop fronts. By 04:54 UT, the top of an inner core starts to be discernible. After the following data gap. a twisted structure can be seen developing. 06:06 - 09:30 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 12:54 UT