KEYHOLE Operations: ------------------ Mon 02/04 - Sun 03/02: 26 m keyhole Mon 02/11 - Sun 02/24: 34 m keyhole - EIT CCD Bakeout scheduled for 02/22 ~ 21:00 UT thru 02/28 ~ 22:00 UT. - S/C Maneuvers (SK and MM) scheduled for 02/19. - LASCO will safe for S/C Maneuvers on 02/18 ~ 11:00 UT and recover on 02/21 ~ 01:00 UT (still TBD). - S/C Roll scheduled for 02/22 15:50 - 21:50 UT. LASCO will close doors for the Roll due too offpointing protection being disabled during the maneuver (estimated time of closed doors: 02/22 16:00 - 19:30 UT). EIT will observe the Roll. - During telemetry outage periods for this Keyhole LASCO and EIT will not be recorded (and instruments will remain idle).
00:00 - 14:30 UT LASCO Data Gap (C2 time). 14:30 UT N East Wide ragged complex front already under development after data gap, apparently consisting of a ragged loop front developing toward ENE (slightly ahead) and another (expanding) one toward NE. The, at least, two-component structure of the event can be better appreciated in C3. WIDTH of the complex event as seen in C3 at 22:18 UT: 105 deg. The northernmost component crosses the N Pole by the very end of the day. X-ray activity below the A level all along the day.
03:06 - 06:30 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 08:06 UT