KEYHOLE Operations: ------------------ Mon 02/04 - Sun 03/02: 26 m keyhole Mon 02/11 - Sun 02/24: 34 m keyhole - EIT CCD Bakeout scheduled for 02/22 ~ 21:00 UT thru 02/28 ~ 22:00 UT. - S/C Maneuvers (SK and MM) scheduled for 02/19. - LASCO will safe for S/C Maneuvers on 02/18 ~ 11:00 UT and recover on 02/21 ~ 01:00 UT (still TBD). - S/C Roll scheduled for 02/22 15:50 - 21:50 UT. LASCO will close doors for the Roll due too offpointing protection being disabled during the maneuver (estimated time of closed doors: 02/22 16:00 - 19:30 UT). EIT will observe the Roll. - During telemetry outage periods for this Keyhole LASCO and EIT will not be recorded (and instruments will remain idle).
00:54 - 04:30 UT LASCO Data Gap (C2 time). 04:30 UT S West Slow development of a system of loop fronts already under development. Ragged front following by 04:54 UT. WIDTH of the event as seen on C3 at 17:18 UT: ~ 50 deg. 08:30 - 16:55 UT LASCO Data Gap (C2 time). 18:31 - 22:30 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 22:30 UT
No images available yet.