KEYHOLE Operations: ------------------ Mon 02/04 - Sun 03/02: 26 m keyhole Mon 02/11 - Sun 02/24: 34 m keyhole - EIT CCD Bakeout scheduled for 02/22 ~ 21:00 UT thru 02/28 ~ 22:00 UT. - S/C Maneuvers (SK and MM) scheduled for 02/19. - LASCO will safe for S/C Maneuvers on 02/18 ~ 11:00 UT and recover on 02/21 ~ 01:00 UT (still TBD). - S/C Roll scheduled for 02/22 15:50 - 21:50 UT. LASCO will close doors for the Roll due too offpointing protection being disabled during the maneuver (estimated time of closed doors: 02/22 16:00 - 19:30 UT). EIT will observe the Roll. - During telemetry outage periods for this Keyhole LASCO and EIT will not be recorded (and instruments will remain idle).
06:54 UT NN West Elongated spray-like front. 08:54 UT NN West Narrow fan-like front. 10:31 - 15:30 UT LASCO Data Gap (C2 time). 15:30 UT S West Slow development of a system of faint loop fronts along the streamer, already under development after data gap. Some 'pairs formation' along the rest of the day and into the next day. Bubble-like event as seen in C3 starting early on next day. WIDTH in C3 at 07:42 UT (the next day): ~40 deg.
05:30 UT E Limb Faint fan-like front. 08:30 - 18:06 UT LASCO Data Gap (C2 time). 19:54 UT S East Elongated and diffuse jet-like front.
03:30 - 11:06 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 12:54 UT