KEYHOLE Operations: ------------------ Mon 02/04 - Sun 03/02: 26 m keyhole Mon 02/11 - Sun 02/24: 34 m keyhole - EIT CCD Bakeout scheduled for 02/22 ~ 21:00 UT thru 02/28 ~ 22:00 UT. - S/C Maneuvers (SK and MM) scheduled for 02/19. - LASCO will safe for S/C Maneuvers on 02/18 ~ 11:00 UT and recover on 02/21 ~ 01:00 UT (still TBD). - S/C Roll scheduled for 02/22 15:50 - 21:50 UT. LASCO will close doors for the Roll due too offpointing protection being disabled during the maneuver (estimated time of closed doors: 02/22 16:00 - 19:30 UT). EIT will observe the Roll. - During telemetry outage periods for this Keyhole LASCO and EIT will not be recorded (and instruments will remain idle).
03:30 UT W Limb Elongated loop front. 05:30 UT W Limb Initially bright ragged loop front. A twisted structure follows behind developing more slowly (narrower than the ragged front). Some trailing material. 06:30 UT S East Elongated spray-like front, top of a very narrow loop front. 10:06 UT S East Faint loop front that fades in C3, not far from its inner edge. 14:54 UT N East Very faint ragged front starts to be discernible well above the limb (Difficult to give an exact time of first appearance). 22:30 - 24:00 UT LASCO Data Gap (C2 time).
00:00 - 11:31 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 12:06 UT