KEYHOLE OPERATIONS: ******************* 11/15 - 12/02: 26 m keyhole 11/19 - 11/28: 34 m keyhole * 11/19 11:00 UT - 11/24 11:00 UT: EIT CCD Bakeout (EIT resumed observations on ~ 11/24 @ ~20:00 UT). * 11/24 ~20:00 UT - 11:26 24:00 UT: EIT 171A cme watch in half res (sm5) to support SECCHI program (12 min cadence). * 11/27: S/C Maneuvers (SK and MM) LASCO closed doors and safed for SOHOs maneuvers on 11/26 and EIT began 171A cme watch in full res with a 7 minute cadence thru 11/28 22:00 UT where LASCO recovers. * LASCO will continue with C2 pb orange filter 6 hr cadence, C3 pb orange filter 12 hr cadence while possible during the keyhole period (only during real-time contacts).
00:54 UT N Pole Diffuse jet-like front. 11:30 UT W Limb Diffuse brightening preceding the slow (gradual) development of a front. Twisted (rather circular) inner core. WIDTH in C3 at 13:39 UT (the next day): ~ 35 deg. 12:30 UT WS West Thin and diffuse spray-like front. 20:30 UT S Pole Thin and diffuse spray-like front.
13:35 UT SS West Small jet-like front that quickly fades. 14:54 UT S Pole Another jet-like front that quickly fades. 15:06 UT NN East Thin spray-like front, top of a thin and elongated loop front. 22:06 UT NN East Very thin loop (jet-like) front.
09:54 UT NN East Faint, diffuse, and thin loop (jet-like) front. 13:54 UT NN East Another faint, diffuse, and thin (jet-like) front. 18:30 UT NN East Elongated and thin loop-like front.
02:06 UT SS East Diffuse jet-like front. 02:30 UT NN East Diffuse jet-like front. 05:30 UT NN East Thin spray-like front, top of a thin and elongated loop front. Last C2 image available by the time of writing: 06:30 UT