LASCO Activity Report for
August 29, 2007 SOHO Science Daily Meeting

Planner: K. Schenk, G. Stenborg

Event times are first frame seen in C2 camera unless otherwise noted.
These are preliminary observations for the daily SOHO science discussions.
Final analysis is reported on the Lasco CME list.
An archive of these reports is available.


Points Of Interest

KEYHOLE OPERATIONS:
--------------------
2007/08/12 - 2007/09/10: 26 m keyhole
2007/08/18 - 2007/09/03: 34 m keyhole

- EIT/LASCO will be recorded for most of the keyhole period. 
  At this time, 2 outages are:
  08/20 17:35 - 08/21 23:05 UT (30 hrs)
  08/27 17:30 - 08/30 05:55 UT 

- EIT will go to CCD bakeout between ~ :
  08/26 21:00 - 09/01 09:00 UT. Recovering at ~ 17:00 UT.

- SOHO Stationkeeping (SK) and Momentum Management (MM) on 08/30.
  SOHO Roll to 0 deg on 08/31.
  LASCO safing for this period: 08/29 ~15:00 - 09/01 ~02:00 UT).



2007/08/28 (Tuesday)

	01:00 - 13:48 UT 	LASCO Data Gap (C2 time).

	17:24 - 22:12 UT	LASCO Data Gap (C2 time).

2007/08/29 (Wednesday)

	00:00 - 04:00 UT	LASCO Data Gap (C2 time).

Last C2 image available by the time of writing:  05:24 UT


Web curator: K.M.Schenk
NASA Goddard Space Flight Center
Solar Physics Branch / Code 682
Greenbelt, MD 20771