KEYHOLE OPERATIONS: -------------------- 2007/08/12 - 2007/09/10: 26 m keyhole 2007/08/18 - 2007/09/03: 34 m keyhole - EIT/LASCO will be recorded for most of the keyhole period. At this time, 2 outages are: 08/20 17:35 - 08/21 23:05 UT (30 hrs) 08/27 17:30 - 08/30 05:55 UT - EIT will go to CCD bakeout between ~ : 08/26 21:00 - 09/01 09:00 UT. Recovering at ~ 17:00 UT. - SOHO Stationkeeping (SK) and Momentum Management (MM) on 08/30. SOHO Roll to 0 deg on 08/31. LASCO safing for this period: 08/29 ~15:00 - 09/01 ~02:00 UT).
03:12 UT EN East Slow development of a system of very faint loop fronts. Difficult to give an exact time of first appearrance. Prominence material can be seen after data gap. WIDTH in C3 at 00:18 UT (the next day): ~ 40 deg (LE at ~ 17.5 solar radii). 06:00 - 08:48 UT LASCO Data Gap (C2 time). 17:24 - 23:36 UT LASCO Data Gap (C2 time).
Last C2 image available by the time of writing: 01:00 UT