KEYHOLE OPERATIONS: -------------------- 2007/08/12 - 2007/09/10: 26 m keyhole 2007/08/18 - 2007/09/03: 34 m keyhole - EIT/LASCO will be recorded for most of the keyhole period. At this time, 2 outages are: 08/20 17:35 - 08/21 23:05 UT (30 hrs) 08/27 17:30 - 08/30 05:55 UT - EIT will go to CCD bakeout between ~ : 08/26 21:00 - 09/01 09:00 UT. Recovering at ~ 17:00 UT. - SOHO Stationkeeping (SK) and Momentum Management (MM) on 08/30. SOHO Roll to 0 deg on 08/31. LASCO safing for this period: 08/29 15:00 - 08/31 20:00 UT (or possibly 09/01 15:00 UT -TBC-).
17:30 - 24:00 UT LASCO Data Gap (C2 time).
04:30 UT N Pole Diffuse jet-like front toward NNE. 05:06 - 16:30 UT LASCO Data Gap (C2 time). 16:54 UT W Limb Big ragged loop front already under development after data gap (LE already well past the outer edge of the C2 FOV). Some gusty outflow follows. WIDTH in C3 at 17:18 UT (LE at ~ 20 solar radii): ~ 80 deg. 20:30 UT N West Faint expanding loop front. It fades throughout C3.
W Limb Some gusty outflow during the day.
01:06 - 08:30 UT LASCO Data Gap (C2 time). 11:30 UT E Limb Fan-like front. Last C2 image available by the time of writing: 11:54 UT