KEYHOLE OPERATIONS: -------------------- 2007/08/12 - 2007/09/10: 26 m keyhole 2007/08/18 - 2007/09/03: 34 m keyhole - EIT/LASCO will be recorded for most of the keyhole period. At this time, 2 outages are: 08/20 17:35 - 08/21 23:05 UT (30 hrs) 08/27 17:30 - 08/30 05:55 UT - EIT will go to CCD bakeout between ~ : 08/26 21:00 - 09/01 09:00 UT. Recovering at ~ 17:00 UT. - SOHO Stationkeeping (SK) and Momentum Management (MM) on 08/30. SOHO Roll to 0 deg on 08/31. LASCO safing for this period: 08/29 15:00 - 08/31 20:00 UT (or possibly 09/01 15:00 UT -TBC-).
04:06 UT N East Jet-like front. 06:30 UT WS West Jet-like front. 18:07 UT WS West Jet-like front.
02:54 UT E Limb Small brightening precedes the development of a ragged elongated loop front (first seen at 03:30 UT). Last C2 image available by the time of writing: 05:06 UT