KEYHOLE OPERATIONS: ------------------ * 2007/02/13 - 2007/03/12: 26 m Keyhole * 2007/02/19 - 2007/03/06: 34 m Keyhole * 2002/02/27: Spacecraft Maneuvers (Not roll) * 2007/03/05: Spacecraft 180 Deg Roll - 2007/02/13 - 2007/03/12: EIT CCD Bakeout (beginning 02/13 @ ~23:00 UT). - LASCO in improved keyhole program starting on 2002/02/14: C2 @12 min cad, C3 @30 min cadence. - LASCO remained idle outside contacts between 2007/02/19 - 2007/03/03.
00:00 - 08:12 UT LASCO Data Gap (C2 time). 09:12 - 14:48 UT LASCO Data Gap (C2 time). 16:24 - 19:48 UT LASCO Data Gap (C2 time). 23:36 UT WN West Faint and ragged elongated structure that fades throughout C2.
00:00 UT W Limb Slow development of a system of faint loop fronts. Last C2 image available by the time of writing: 10:36 UT.