
LASCO Activity Report for
December 11, 2006 SOHO Science Daily Meeting
Planner: K. Schenk, G. Stenborg
Event times are first frame seen in C2 camera unless otherwise noted.
These are preliminary observations for the daily SOHO science discussions.
Final analysis is reported on the Lasco CME list.
An archive of these reports is available.
Points Of Interest
KEYHOLE (#15) Operations:
-------------------------
* 2006/11/24 - 2006/12/11: 26 m keyhole
* 2006/11/27 - 2006/12/08: 34 m keyhole
* SOHO Maneuvers on 2006/12/05 (Station Keeping, Momentum Management and Roll)
LASCO closed doors on 2006/12/04 at ~ 15:00 UT and resumed operations on
2006/12/06 at ~ 19:00 UT.
* 2006/11/25 - 2006/12/12: EIT Bakeout
* The TLM Keyhole #15 will have short daily passes and therefore limited
LASCO recorded data. Outside the periods of contact LASCO will go idle via
the on-board program.
* LASCO will observe in improved mode during TLM Keyhole #15 (C2 12 min
cadence, C3 30 min cadence with daily orange/blue pairs and pB if possible.)
2006/12/08 (Friday)
Note:
----
Images still highly degreded by the ongoing proton storm, which starts
subsiding by the end of the day.
00:00 UT S East A CME (most likely trailing material) can be guessed
under development in the highly degrades C2 and C3
images.
13:33 - 18:46 UT LASCO Data Gap.
19:19 UT WN West Bright ragged loop front with (apparently) structured
interior.
2006/12/09 (Saturday)
Note:
----
The proton storm still continues, gradually less intense.
05:18 - 08:06 UT LASCO Data Gap.
14:36 UT E Limb Small front that fades close to the inner edge of C3.
19:36 UT S West Elongated and ragged loop-like structure. It fades
throughout C3.
2006/12/10 (Sunday)
Note:
----
The proton storm still continues, gradually less intense.
No significant activity.
2006/12/11 (Monday)
Last C2 image available by the time of writing: 00:00 UT.
Web curator:
K.M.Schenk
NASA Goddard Space Flight Center
Solar Physics Branch / Code 682
Greenbelt, MD 20771