SOHO KEYHOLE #10 telemetry period: Aug 31-Sep 28, 2005. EIT CCD bakeout between Sep 2 23:00 UT - Sept 23 10:00 UT with its mini-cal pre and post sets as folows: 2005/09/02 19:00:00 - 2005/09/03 01:00:00 2005/09/23 20:00:00 - 2005/09/24 00:20:00 During the Telemetry Keyhole LASCO will be in improved synoptic cadence of C2 at 12 mins cadence and C3 at 30 mins cadence, including daily orange/blue filter fielding images.
00:00 UT E Limb Loop front already in progress. 12:36 - 14:48 UT Temporary Data Gap. 18:24 UT E Limb Very faint and diffuse front that fades throughout C2. 19:36 UT E Limb Elongated and asymmetric loop front a little bit to S of previous event, apparently the top of a twisted structure.
00:12 UT E Limb A bright loop front followed by a cavity and twisted inner core develops in the trailing material of the event reported to start at 19:36 UT on previous day. 03:12 - 12:12 UT Temporary DSN Data Gap. Last C2 image available by the time of writing: 12:36 UT.