SOHO KEYHOLE #10 telemetry period: Aug 31-Sep 28, 2005. EIT CCD bakeout between Sep 2 23:00 UT - Sept 23 10:00 UT with its mini-cal pre and post sets as folows: 2005/09/02 19:00:00 - 2005/09/03 01:00:00 2005/09/23 20:00:00 - 2005/09/24 00:20:00 During the Telemetry Keyhole LASCO will be in improved synoptic cadence of C2 at 12 mins cadence and C3 at 30 mins cadence, including daily orange/blue filter fielding images.
13:48 - 15:48 UT Temporary Data Gap. 16:12 UT S East Ragged loop front already under development after data gap. 19:00 - 23:12 UT Temporary Data Gap.
EN East Since late on previous day, the very slow development of a system of very faint loops along the streamer can be discerned. 00:00 UT E Limb Elongated loop-like front. A diffuse brightening preceding the front can be discerned since very late on previous day. 03:36 - 08:36 UT Temporary Data Gap. Last C2 image under analysis: 12:36 UT.