KEYHOLE OPERATIONS: ------------------- SOHO keyhole #10 telemetry period: Aug 31-Sep 28, 2005. EIT will go to CCD bakeout between Sep 2 23:00 UT - Sept 23 10:00 UT with its mini-cal pre and post sets as folows: 2005/09/02 19:00:00 - 2005/09/03 01:00:00 2005/09/23 20:00:00 - 2005/09/24 00:20:00 During the Telemetry Keyhole LASCO will be in improved synoptic cadence of C2 at 12 mins cadence and C3 at 30 mins cadence, including daily orange/blue filter fielding images. The SOHO roll back to 0 deg is scheduled for Thursday Sept 8, 2005. LASCO will safe for the S/C roll (also Station Keeping -SK- and Momentum Management -MM-) on Wed Sept 7 at 11:00 UT and re-open Friday Sept 9 at 12:00 UT.
00:48 - 04:36 UT Temporary DSN Data Gap. 04:36 UT W-WS West Ragged loop fronts already under development after data gap. Twisted structure slowly developing. 06:00 UT S East Ragged blob fronts along streamer. Faint arcades apparently connecting to NE. Time of the last C2 image analyzed: 11:00 UT. 11:00 UT LASCO closes doors in preparation for S/C roll, MM, and SK on 2005/09/08.
LASCO doors CLOSED. No images.