KEYHOLE OPERATIONS: ------------------- SOHO keyhole #10 telemetry period: Aug 31-Sep 28, 2005. EIT will go to CCD bakeout between Sep 2 23:00 UT - Sept 23 10:00 UT with its mini-cal pre and post sets as folows: 2005/09/02 19:00:00 - 2005/09/03 01:00:00 2005/09/23 20:00:00 - 2005/09/24 00:20:00 During the Telemetry Keyhole LASCO will be in improved synoptic cadence of C2 at 12 mins cadence and C3 at 30 mins cadence, including daily orange/blue filter fielding images. The SOHO roll back to 0 deg is scheduled for Thursday Sept 8, 2005. LASCO will safe for the S/C roll (also Station Keeping -SK- and Momentum Management -MM-) on Wed Sept 7 at 11:00 UT and re-open Friday Sept 9 at 12:00 UT.
03:36 UT N West Diffuse and very faint ragged loop front. It fades throughout C3. 08:12 UT S East Diffuse and ragged front, apparently the top of a diffuse twisted structure that expands toward N. 20:00 UT S East Initially bright loop front develops as an asymmetric and expanding bright loop front mainly toward E. GOES recorded a long duration M1.4 X-ray flare on S12E88 (AR barely behind the limb) between 09/06 19:32 - 09/07 00:44 UT with peak emission at 22:02 UT. 21:12 UT WN West Gradual brightening of the cusp of the streamer preceding the development of a bright loop front followed by a cavity and apparently twisted inner core (prominence material). Typical 3-part structure CME. Development partly missed in following data gap.
00:48 - 04:36 UT Temporary DSN Data Gap. 04:36 UT W-WS West Ragged loop fronts already under development after data gap. Time of the last C2 image analyzed: 11:00 UT. 11:00 UT LASCO closes doors in preparation for S/C roll, MM, and SK on 2005/09/08.