
LASCO Activity Report for
August 31, 2005 SOHO Science Daily Meeting
Planner: K. Schenk, G. Stenborg
Event times are first frame seen in C2 camera unless otherwise noted.
These are preliminary observations for the daily SOHO science discussions.
Final analysis is reported on the Lasco CME list.
An archive of these reports is available.
Points Of Interest
KEYHOLE OPERATIONS:
-------------------
SOHO keyhole #10 telemetry period: Aug 31-Sep 28, 2005.
EIT will go to CCD bakeout between Sep 2 23:00 UT - Sept 23 10:00 UT
with its mini-cal pre and post sets as folows:
2005/09/02 19:00:00 - 2005/09/03 01:00:00
2005/09/23 20:00:00 - 2005/09/24 00:20:00
During the Telemetry Keyhole LASCO will be in improved synoptic cadence
of C2 at 12 mins cadence and C3 at 30 mins cadence, including daily
orange/blue filter fielding images.
The SOHO roll back to 0 deg is scheduled for Thursday Sept 8, 2005.
LASCO will safe for the S/C roll (also Station Keeping and Momentum
Management) on Wed Sept 7 at 11:00 UT and re-open Saturday Sept 10
at 12:00 UT.
2005/08/30 (Tuesday)
03:54 UT WS West Faint loop front a little bit to N of the gusty outflow.
09:06 UT NN East Faint jet-ike front.
2005/08/31 (Wednesday)
03:54 - 09:54 UT Temporary DSN Data Gap.
10:06 UT N East Faint ragged loop front develops, apparently, as at
least a Partial Halo CME. More after getting the data
from the gap...
11:30 UT WN West Brightening just appearing develops as a ragged loop
front.
Time of the last C2 image under analysis: 12:06 UT.
Web curator:
K.M.Schenk
NASA Goddard Space Flight Center
Solar Physics Branch / Code 682
Greenbelt, MD 20771