LASCO taking high cadence observations with both C2 and C3 running at 10-min cadence for duration of EIT bakeout, scheduled to end 2003/10/03 ~20 UT (TBC)
01:20 UT N Pole System of faint wide loop fronts first become visible some way into C2, prolonged gusty outflow in NE including fronts and blobs 04:20 UT W Limb Narrow ragged asymmetric front along streamer, quite bright with some gusty outflow 05:10 UT E Limb Faint spray 18:30 UT w Limb Faint ragged front with slight gusty outflow, quite wide 19:30 UT S East Slow spray-like front, quite faint
06:00 - 12:00 UT Temporary DSN data gap