LASCO taking high cadence observations with both C2 and C3 running at 10-min cadence for duration of EIT bakeout, scheduled to end 2003/10/03 ~20 UT (TBC)
00:00 UT N West Ragged asymmetric loop front along streamer slight cavity and gusty outflow follow 02:30 UT S Pole Sequence of extremely faint wide loop fronts 09:10 UT N West Faint ragged front with slight outflow 10:40 UT S West Initially quite bright thin loop front fades through C2 20:40 UT N East Initially bright ragged loop front with cavity fades and disintegrates through C2
00:00 - 02:30 UT Temporary DSN data gap 02:30 UT N East Narrow ragged loop front fades and disintegrates through C2 05:30 UT W Limb Initially bright ragged loop front with cavity fades and disintegrates through C2 06:00 - ~14:30 UT Temporary DSN data gap