LASCO taking high cadence observations with both C2 and C3 running at 10-min cadence for duration of EIT bakeout, scheduled to end 2003/10/03 ~20 UT (TBC) Sporadic LASCO data ~00-04 UT 2003/09/26 due to EIT pre-bakeout calibration images
03:30 UT S West Narrow ragged front along streamer follows very slow loops, partial blowout in progress? 10:30 UT N East Fairly wide bright ragged front along faint narrow streamer 20:30 UT N East Wide bright loop front with cavity and core, quite slow. Backsided event 21:54 UT S East Faint ragged fronts follow extremely slow loops along wide bright streamer that has been swelling and brightening for several hours. Partial blowout still in progress at writing with some faint fronts spanning over S pole
04:15 - ~14:15 UT Temporary DSN data gap