LASCO's high-cadence synoptic campaign has ended and the regular synoptic sequence with additional pB's has recommenced, in support of JOP 139
02:00 UT W Limb Ragged front with arcades 04:00 UT N East Bright front with core and arcades 08:15 UT W limb Bright loop front with cavity and core. Arcades and cross-hatching follow 15:30 UT E Limb Bright spray followed by narrow ragged front 20:14 UT S West Slow loops rise along streamer, fade in C2 21:49 UT S East Fast bright loop front, cavity and faint core
01:50 UT E Limb Prolonged ragged outflow 03:52 UT S West Ragged front, fairly faint, ragged outflow follows with some bright features. M1 flare in AR 9455 06:26 UT E Limb Ragged narrow front brighter than earlier events from same/similar source region 07:29 UT E Limb Another front, brighter and faster. Arcades and cross-hatching follow