EIT bakeout and LASCO high cadence campaign ended ~20:00 UT 2/20/2001 All timimgs prior to that time are approximate, accurate to ~15 mins due to only a small selection of the high cadence data being viewed.
21:30 UT HALO (?) Bright front over E and NE with faint extensions elsewhere. Certainly appears to surround ~270 deg. No EIT data, checking other sources.
12:35 UT S West Faint wide spray 13:35 UT W Limb Sequence of two fairly wide bright loops 15:00 UT N East Wide bright front fills whole sector, followed by cavity and complex, helical core. High cadence data for C2 and ~half of C3 17:00 UT N West Bright front with cavity and core, not as wide as above event 20:36 UT S Pole Narrow ragged bright front 21:46 UT S West Bright feature ejected along streamer. Followed by slow faint loops for rest of day 23:54 UT N West Narrow bright Y-type dsconnection feature, part of 17:00 event?
04:06 UT N East Slow loops begin to rise. 'Core-like' material visible by ~11:06. Still in progress at end of data 06:30 UT S West Brightest feature within slow rising loops (since 21:46) 11:30 UT N West Faint slow ragged loops