Lasco Doors opened Jan 18th, 2001. Synoptic plan resumed at 23:00 UT.
15:06 UT S Pole Rising loops over limb. No apparent eruption seen, but twisting continued outflows for 20 hours. 17:06 UT East Limb Bright loop front with core. Continued outflows. 18:30:32 UT C2 Running Difference Image.
19:31 UT East Full HALO CME event. Largest looping over East limb at position angle 95 degrees. Already in progress at 19:31 UT. Results of M1 flare AR 9313 20:06:05 UT C2 Running Difference Image. 21:30 UT East 2nd Full HALO CME event. Results of M7.7 flare AR 9313. 21:54:05 UT C2 Running Difference Image. C2 Running Difference Movie Of Both Events.
10:55 UT S West Faint puff event, small. 12:54 UT S West Larger loop front, same region as 10:55 UT. jet-like with narrow outflow. 19:54 UT East Limb Jagged bright front, sizeable with bright interior structure. Interesting! 21:30:14 UT C2 Running Difference Image. 21:54:06 UT C2 Running Difference Image. 21:54:05 UT C2 Running Difference Image.
00:30 - 07:00 UT temporary DSN data gap.