EIT activity report for
2002/02/01 daily meeting

Planner: Gurman/Schenk

DateStartEndGOESAR OtherPADescription
2002/01/3102:0002:24   9797CME  jet to SSE
2002/01/3110:14  C3 9802   small loop brightening
2002/01/3111:1211:48    SSW backside, narrow
2002/01/3114:3615:36 M4 9787  SW backside brightning over limb
nice post event loops.
2002/01/3116:4817:12 C5 9800CME CM AR now at disk center.
2002/01/3117:4818:12   9802CME CM Small event.
2002/01/3119:1322:17   EPL NW Filament activation, possible
emission from front. CME
also from the backside, slow.
2002/01/3122:3801:00   9807CMESSE  
2002/02/0101:4803:00   9806CME NE With dimming at [N11;E28]
2002/02/0103:36    CME NW Fast jet behind limb.
2002/02/0104:2405:00   CME W CME/spray behind limb, bright.
Post event loops over limb.
2002/02/0110:00    EPL SW Filament activation in progress
[S16;W35]
2002/02/0111:00    EPL NE Filament activation in progress
[N14;E4], just West of AR9805


Web curator: Joseph B. Gurman
Responsible NASA official: Joseph B. Gurman, Facility Scientist, Solar Data Analysis Center
gurman@gsfc.nasa.gov
+1 301 286-4767

NASA Goddard Space Flight Center
Solar Physics Branch / Code 682
Greenbelt, MD 20771

Last revised - J.B. Gurman