5.1.4 Light Curve of HXS-PC


next up previous contents
Next: 5.1.5 Light Curve of Up: 5.1 How to Plot Previous: 5.1.3 Light Curves of

5.1.4 Light Curve of HXS-PC

 

After having read the WBS data with YODAT, you can get a light curve of the count rate (counts/0.125 sec) of HXS-PC1, HXS-PC2 or HXS- PC1+PC2 with UTPLOT. There are some optional inputs such as error bars, integration time, time range and summation of adjacent pulse count (PC) data etc.
IDL> plot_hxspc,index,data,pc
 
IDL> plot_hxspc,index,data,2

IDL> plot_hxspc,index,data,[1,2]
where pc is 1 to have PC1 plotted, 2 for PC2, and [1,2] to have the sum of PC1 and PC2 plotted. NOTE: You must be careful of the limitation due to dead time correction (see DTCF_PC_HXS.PRO in the Reference Guide).


ydac@mssly1.mssl.ucl.ac.uk