L.2 Dates that SXT CCD was Baked Out


next up previous contents
Next: L.3 Table of Number Up: L Yohkoh and General Previous: L.1 Table of Dates

L.2 Dates that SXT CCD was Baked Out

The following table shows the dates that the SXT CCD thermo electric cooler (TEC) was turned off, and the TEC heater was turned on. The routine PR_DATES_WARM can generate this list at any time for sites which have the SSL database.

 

PR_DATES_WARM Program Run: 11-Jan-1994 22:51:01.00
 
   Date         Date          Approx #     High
   Warm         Cold         days warm     Temp
 
 9-JAN-92     10-JAN-92       2 days at   -0.6 C
 8-APR-92     11-APR-92       4 days at   23.8 C
 9-JUN-92     11-JUN-92       3 days at   -2.5 C
 4-SEP-92      6-SEP-92       3 days at   -1.2 C
 8-JAN-93      9-JAN-93       2 days at   23.8 C
21-JAN-93     22-JAN-93       2 days at   23.8 C
 5-APR-93      6-APR-93       2 days at   23.8 C
 4-JUL-93      5-JUL-93       2 days at   22.5 C
22-AUG-93     24-AUG-93       3 days at   25.2 C
 8-NOV-93     10-NOV-93       3 days at   23.8 C


ydac@mssly1.mssl.ucl.ac.uk