KEYHOLE OPERATIONS: ******************* 11/15 - 12/02: 26 m keyhole 11/19 - 11/28: 34 m keyhole * 11/19 11:00 UT - 11/24 11:00 UT: EIT CCD Bakeout (EIT resumed observations on ~ 11/24 @ ~20:00 UT). * 11/24 ~20:00 UT - 11:26 24:00 UT: EIT 171A cme watch in half res (sm5) to support SECCHI program (12 min cadence). * 11/27: S/C Maneuvers (SK and MM) LASCO closed doors and safed for SOHOs maneuvers on 11/26 and EIT began 171A cme watch in full res with a 7 minute cadence thru 11/28 22:00 UT where LASCO recovers. We will stay in 171A thru 11/30 and change into 195 on 12/01. * LASCO will continue with C2 pb orange filter 6 hr cadence, C3 pb orange filter 12 hr cadence while possible during the keyhole period (only during real-time contacts).
LASCO Doors closed (S/C Maneuvers: SK and MM).
LASCO recovery at ~ 22:00 UT.