KEYHOLE Operations: ------------------- 26 m keyhole: 2007/05/18 - 2007/06/05 34 m keyhole: 2007/05/21 - 2007/06/01 While in Keyhole, improved cadence in LASCO C2 (12 min) and LASCO C3 (30 mins). EIT CCD bakeout ended on 2007/05/24. Observations resumed on 05/25. EIT CCD Bakeout as originally planned: started on 2007/05/18 @ ~15:00 UT and ends on 2007/06/05. Spacecraft Maneuvers on Tuesday 2007/05/29. (Station Keeping, Momentum Management, and 180 deg Roll. LASCO safed on 2007/05/28 @ 12:00 UT and recovered on 2007/05/31 @ ~ 01:00 UT.
LASCO Doors Closed because of S/C Maneuvers on 05/29. EIT remained open thru the maneuvers at these times: 2007/05/28 12:36 - 17:20 2007/05/29 04:18 - 05:40 2007/05/29 18:00 - 2007/05/30 23:00 EIT was in half res, at a 7 minute cadence.
EIT/LASCO synoptic program (EIT in 195A CME watch) resumed on 05/31 @ ~ 01:30 UT. First C2 image after S/C Maneuvers: 01:29 UT First C3 image after S/C Maneuvers: 01:42 UT 01:54 UT ES East Faint front already under development. WIDTH in C3 at 04:42 UT: ~ 25 deg. The event fades throughout C3.