KEYHOLE OPERATIONS: ------------------ * 2007/02/13 - 2007/03/12: 26 m Keyhole * 2007/02/19 - 2007/03/06: 34 m Keyhole * 2002/02/27: Spacecraft Maneuvers (Not roll) * 2007/03/05: Spacecraft 180 Deg Roll - 2007/02/13 - 2007/03/12: EIT CCD Bakeout (beginning 02/13 @ ~23:00 UT). - LASCO in improved keyhole program starting on 2002/02/14: C2 @12 min cad, C3 @30 min cadence. - LASCO remained idle outside contacts between 2007/02/19 - 2007/03/03.
00:00 UT W Limb Slow development of a system of faint loop fronts followed by a twsited (rather circular) structure (gradual event). Pseudo-continuous outflow superposed in the LOS. WIDTH in C3 at 23:18 UT: ~ 45 deg.
04:00 - 12:12 UT LASCO Data Gap (C2 time). Last C2 image available by the time of writing: 14:00 UT.