KEYHOLE OPERATIONS: ------------------ * 2007/02/13 - 2007/03/12: 26 m Keyhole * 2007/02/19 - 2007/03/06: 34 m Keyhole * 2002/02/27: Spacecraft Maneuvers (Not roll) * 2007/03/05: Spacecraft 180 Deg Roll - 2007/02/13 - 2007/03/12: EIT CCD Bakeout (beginning 02/13 @ ~23:00 UT). - LASCO in improved keyhole program starting on 2002/02/14: C2 @12 min cad, C3 @30 min cadence. - LASCO will remain idle outside contacts between 2007/02/19 - 2007/03/03.
02:00 UT ES East Very small blob-like front followed by another one at 03:48 UT. They fade throughout C3.
08:24 UT W Limb Slow development of a fan-like front, apparently top of an elongated ragged loop-like structure. Last C2 image available by the time of writing: 13:24 UT.