KEYHOLE (#15) Operations: ------------------------- * 2006/11/24 - 2006/12/11: 26 m keyhole * 2006/11/27 - 2006/12/08: 34 m keyhole * SOHO Maneuvers on 2006/12/05 (Station Keeping, Momentum Management and Roll) LASCO closed doors on 2006/12/04 at ~ 15:00 UT and resumed operations on 2006/12/06 at ~ 19:00 UT. * 2006/11/25 - 2006/12/12: EIT Bakeout * The TLM Keyhole #15 will have short daily passes and therefore limited LASCO recorded data. Outside the periods of contact LASCO will go idle via the on-board program. * LASCO will observe in improved mode during TLM Keyhole #15 (C2 12 min cadence, C3 30 min cadence with daily orange/blue pairs and pB if possible.)
Note: ---- Images still highly degreded by the ongoing proton storm, which starts subsiding by the end of the day. 00:00 UT S East A CME (most likely trailing material) can be guessed under development in the highly degrades C2 and C3 images. 13:33 - 18:46 UT LASCO Data Gap. 19:19 UT WN West Bright ragged loop front with (apparently) structured interior.
Note: ---- The proton storm still continues, gradually less intense. 05:18 - 08:06 UT LASCO Data Gap. 14:36 UT E Limb Small front that fades close to the inner edge of C3. 19:36 UT S West Elongated and ragged loop-like structure. It fades throughout C3.
Note: ---- The proton storm still continues, gradually less intense. No significant activity.
Last C2 image available by the time of writing: 00:00 UT.