KEYHOLE Operations: ------------------- 2006/08/21 - 2006/09/19 : 26 m Keyhole 2006/08/28 - 2006/09/13 : 34 m Keyhole - Spacecraft Maneuvers (Station Keeping and Momentum Management, not roll) on 09/02 (TBC). - 2006/08/19 - 2006/09/16 : EIT CCD Bakeout - LASCO will be recorded during DSN gaps confirmed thru 08/23... possibly thru 8/27+ (TBC). - 12 minutes cadence for C2 during Keyhole.
02:24 UT S East Faint and elongated ragged loop-like front. It fades throughout C3. 06:48 UT EN East Diffuse brightening along streamer that fades throughout C2. 07:48 UT N Pole Diffuse jet-like front. 14:12 UT NN East Jet-like front. 16:00 UT S East Very Diffuse and not-well-defined front. It fades throughout C3. 20:57 - 23:12 UT LASCO Data Gap (C2 Time).
00:12 UT S East Elongated loop front. Last C2 image available by the time of writing: 07:12 UT.