KEYHOLE Operations: ------------------- 2006/08/21 - 2006/09/19 : 26 m Keyhole 2006/08/28 - 2006/09/13 : 34 m Keyhole - Spacecraft Maneuvers (Station Keeping and Momentum Management, not roll) on 09/02 (TBC). - 2006/08/19 - 2006/09/16 : EIT CCD Bakeout - LASCO will be recorded during DSN gaps confirmed thru 08/23... possibly thru 8/27+ (TBC). - 12 minutes cadence for C2 during Keyhole.
03:24 UT E Limb Faint brightening preceding the development of a twisted structure slightly toward ESE. The event is preceded by a couple of blob-like fronts early in the day. 07:12 UT WS West Elongated and very faint loop front. 12:00 UT E Limb Faint loop front (slightly developing toward ESE) in the trailing material of the event reported to start at 03:24 UT. 22:36 UT S East Very faint and diffuse loop front. It fades close to the inner edge of C3.
02:24 UT S East Faint and elongated ragged loop-like front. 06:48 UT EN East Diffuse brightening along streamer. 07:48 UT N Pole Diffuse jet-like front. Last C2 image available by the time of writing: 11:36 UT.