KEYHOLE Operations: ------------------- 2006/08/21 - 2006/09/19 : 26 m Keyhole 2006/08/28 - 2006/09/13 : 34 m Keyhole - 2006/08/19 - 2006/09/16 : EIT CCD Bakeout - LASCO will be recorded during DSN gaps confirmed thru 08/23... possibly thru 8/27+ (TBC). - 12 minutes cadence for C2 during Keyhole.
E Limb Slow development of a system of faint loops since very early in the day. Difficulkt to give an exact time of first appearance. The event develops as a big twisted structure well before noon. Pseudo- continuous outflow superposed in the LOS. 01:12 UT S West Faint and small ragged front that fades throughout C2. 02:36 UT S West Another ragged front, brighter than the previous one. It fades throughout C3. Gusty outflow afterward in the form of sporadic small ragged fronts thru the afternoon. Some infalling material on the W Limb all along the day.
00:00 - 07:12 UT Temporary DSN Data Gap (C2 time). 07:12 UT E Limb Apparently another twisted structure already under development (slightly toward ESE) after data gap. 07:12 UT WS West Elongated and very faint loop front. Last C2 image available by the time of writing: 10:00 UT.