KEYHOLE Operations: ------------------- 2006/08/21 - 2006/09/19 : 26 m Keyhole 2006/08/28 - 2006/09/13 : 34 m Keyhole - 2006/08/19 - 2006/09/16 : EIT CCD Bakeout - LASCO will be recorded during DSN gaps confirmed thru 08/23... possibly thru 8/27+ (TBC). - 12 minutes cadence for C2 during Keyhole.
04:36 UT S West Very faint elongated loop front. It fades close to the inner edge of C3. 12:24 UT S East Initially diffuse loop front develops as a ragged loop front. 19:00 - 23:12 UT Temporary Data Gap (C2 time).
W Limb Apprently twisted structure already under development after data gap. Last C2 image available by the time of writing: 01:12 UT.