June 8 - June 19, 2006: ----------------------- LASCO will support the Ulysses-SOHO Quadrature Observations with 6 hr cadence, C2 orange/clear filter pB sets taken at these times: 02:54, 08:54, 14:54, and 20:54 UT. The extra pB sequences will then continue through June 21, i.e., 14 days total (half rotation run). Note: EIT will be recovered and observing, scheduled for June 16 ~ 00:00 UT. The C2 additional pB images will reduce the EIT imaging by 6 per day. Telemetry (TLM) Keyhole: 05/27/2006 - 06/14/2006 ----------------------- - EIT will be in CCD bakeout during the following period: . 05/26/2006 21:15 - 05:15 ==> Long pre-bake cal set. EIT will have heaters on at ~ 02:00 UT. . 06/15/2006 08:00 UT heaters off, Bakeout ends. . 06/15/2006 16:00 - 00:40 UT post bake long cal set. Observations expected to resume by 22:00 UT. - LASCO is in improved keyhole synoptics: 12 minute C2, 30 minute C3 cadences.
01:48 UT WS West Elongated and very ragged loop front. Trailing material and then some gusty outflow.
No significant activity... Last C2 image available by the time of writing: 07:36 UT