KEYHOLE Operations: ------------------- * Feb 22 - Mar 21: 26 m Keyhole. * Feb 28 - Mar 16: 34 m Keyhole. - EIT resumed operation on 2005/03/18 @ ~ 20:15 UT after CCD bakeout and post-cal sets. 304A CME watch in Full Res. - LASCO C2: 03/17 20:00 UT thru 3/18 19:00 UT Optical Flows in C2. --> C2 FF orange/clear 50 sec exposure, pixel summed @ 4 min cadence; plus at the top of each hour i) a fffres C2 and ii) a fffres C3 image. - Improve C2/C3 cadence for the rest of the Keyhole: 12 min cadence for C2, 30 min cadence for C3. - EIT CCD Bakeout bewtween 2006/02/28 03:00 UT - 2006/03/18.
07:36 UT WN West Very faint and diffuse front that fades throughout C2. 08:48 UT ES East Diffuse brightening along streamer, first seen in C3 at 10:18 UT. Trailing material during the rest of the day. 20:01 UT ES East Faint and diffuse front. It fades throughout C3. 23:01 UT S West Jet-like front.
06:01 UT NN West Faint and diffuse loop front. It fades throughout C3. It is followed by another one at 12:04 UT on NW. 23:54 UT WN West Elongated loop front. It fades throughout C3.
06:30 UT E Limb Elongated brightening that fades close to the inner edge of C3. 15:30 UT WN West Elongated and slightly curved feature develops as an elongated loop front. It fades throughout C3. Another similar (though fainter) feature develops by 20:06 UT.
00:06 - 07:32 UT Temporary DSN Data Gap. Last C2 image available by the time of writing: 10:31 UT.