KEYHOLE Operations: ------------------- * Feb 22 - Mar 21: 26 m Keyhole. * Feb 28 - Mar 16: 34 m Keyhole. - "Brueckner Plumes study" resumed after S/C Maneuvers. Observing plan will run until next Roll Maneuver (expected to occur on 2006/03/13). - S/C Maneuvers (Station Keeping and Momentum Management) on 2006/03/07 ==> LASCO safed for maneuvers on 2006/03/06 @ ~19:30 UT. LASCO recovery on 2006/03/10 (due to DSN & Mars explorer) @ 02:30 UT. - LASCO run a version of the "Brueckner plumes study" of Mar 21 1997 prior to the S/C maneuver (32x13 LOCS block FOV over the South pole including the coronal hole, starting on 2006/02/28 @ 03:45 UT; the sequence was C2 orange/clear filters, 100 sec exp, 5 min cadence). In addition, there were FFFres C2 and C3 at 1 hr cadence for the web and daily orange/blue fielding images and orange filter pB sets. - EIT CCD Bakeout bewtween 2006/02/28 03:00 UT - 2006/03/18.
LASCO Doors closed. Note: ----- LASCO recovery on 2006/03/10 @ 02:30 UT
First Full Field C2 image after recovery: 02:42 UT First Full Field C3 image after recovery: 02:47 UT 02:42 UT N West Slow development of a system of loops already under development. Last C2 image available by the time of writing: 09:05 UT