KEYHOLE Operations: ------------------- * Feb 22 - Mar 21: 26 m Keyhole. * Feb 28 - Mar 16: 34 m Keyhole. - S/C Maneuvers (Station Keeping and Momentum Management) on 2006/03/07 ==> LASCO safed for maneuvers on 2006/03/06 @ ~19:30 UT. LASCO recovery is scheduled for 2006/03/10 (due to DSN & Mars explorer) @ 03:30 UT. - LASCO run a version of the "Brueckner plumes study" of Mar 21 1997 prior to the S/C maneuver (32x13 LOCS block FOV over the South pole including the coronal hole, starting on 2006/02/28 @ 03:45 UT; the sequence was C2 orange/clear filters, 100 sec exp, 5 min cadence). In addition, there were FFFres C2 and C3 at 1 hr cadence for the web and daily orange/blue fielding images and orange filter pB sets. - EIT CCD Bakeout bewtween 2006/02/28 03:00 UT - 2006/03/18. - TRACE performed detector annealing: 2006/02/27 - 2006/03/03. Therefore, there was no full disk mosaics during this period to compensate for the lack of EIT images during the bakeout period.
LASCO Doors closed (S/C Maneuvers: MM and S/K).
LASCO Doors closed.