KEYHOLE Operations: Dec 3 - Dec 20 (26 m) Dec 6 - Dec 17 (34 m) EIT CCD bakeout (+ pre and post cal) between Dec 2 ~ 18:12 UT - Dec 18 21:00 UT.
S West Gusty outflow along a streamer all along the day. 14:00 UT S East Faint and elongated loop front. It fades throughout C3. 14:36 - 16:48 UT LASCO data gap (C2 time). 21:36 UT E Limb Diffuse loop front that fades throughout C2.
N West Very slow development of a system of faint loops -1- since late on previous day (difficult to give an exact time of first appearance). A narrow and apparently elongated and circular structure starts to be discernible by the end of the day. The event will result in a streamer blowout clearly seen in C3 on next day by around 10 UT. 00:12 UT N West Diffuse front superposed in the LOS with -1- (see previous entry) and moving faster. 19:36 UT W Limb Top of a loop front just appearing preceded by a diffuse brightening. It develops as a big and twisted expanding structure.
N West Several small reconection type events during the day, along the thin current sheet left behind the event described at the very beginning of previous day. 11:36 UT WS West Elongated and ragged loop front in the trailing material of event reported to start at 19:36 UT on previous day. It is followed at 17:00 UT by another elongated structure. 16:24 UT S West A small and ragged blob-like front develops as a twisted (circular) structure in the C2 FOV, just a little bit to S of event reported to start at 17:00 UT - see previous entry - (and moving more slowly). 17:24 UT EN East Diffuse brightening precedes the development of a loop front. A twisted (rather circular) structure follows by 18:00 UT, developing more slowly.
See Report on Dec 14, 2005.