- EIT resumed (195) CME watch on 2005/09/23 @ ~ 22:51 UT after CCD bakeout. - EIT Filament Observation program with THEMIS/DOT/CDS: 12 min cadence 304A Full Res on 05/09/24 between 07:36 - 19:19 UT. SOHO KEYHOLE #10 telemetry period: Aug 31-Sep 28, 2005. During the Telemetry Keyhole LASCO will be in improved synoptic cadence of C2 at 12 mins cadence and C3 at 30 mins cadence, including daily orange/blue filter fielding images.
00:12 UT E Limb A bright loop front followed by a cavity and twisted inner core develops in the trailing material of the event reported to start at 19:36 UT on previous day. Gusty outflow. 06:24 UT SS West Extremely faint loop front. Barely visible in C3. 14:12 UT SS West Slow development of a very faint and expanding loop front. It fades throughout C3. 20:57 - 23:34 UT Temporary Data Gap. 23:34 UT ES East Elongated loop front already under development after data gap. It fades throughout C3.
15:54 UT N East Diffuse brightening top of an apparently twisted structure. It is followed at 16:54 UT a little bit to N by a diffuse loop front that spans up to the N Pole. They all fade throughout C3.
02:06 UT E Limb Elongated loop front. It fades throughout C3. Otherwise, mostly quiet.
Mostly quiet. Last C2 image available by the time of writing: 11:06 UT.